Pre-condition: The existing building’s space is conditioned by a permanently installed electric resistance heating system as its primary heat source. No other heating sources are eligible.
Post-condition: No additional requirement.
Pre-condition: The existing building’s space is conditioned by an air source heat pump, either currently working or not working.
Post-condition: New ASHP meets the efficiency requirements for upgrades.
A project can claim both Retrofit and Upgrade rebates if all conditions are met.
The AHRI certificate for each model installed is required.
Please note: Rebate(s) will not exceed 70% of the installed job cost. To calculate the projected rebate, either:
If assistance is needed with this application, call (888) 883-9879 or email rebates@esgroupllc.com.
Please allow 6 to 8 weeks after receipt of all required documentation for rebate checks to be issued and mailed.
Last Update: 3/1/24